6 | The balustrading during construction.

7 | Erecting the protective cladding and the posts for the balustrading from a movable platform.

7 | Erecting the protective cladding and the posts for the balustrading from a movable platform.

1 | Diagonal bracing under bridge beams, scale 1:50. The 4.60 m grid length determines the parapet post spacing.

2 | Formation of a point of intersection of the diagonal bracing, scale 1:20. The 60 x 160 mm diagonal timbers intersect at two levels. All the screw connections remain visible and accessible for inspection purposes. The nailed plates are pre-drilled and in part have perforated disks welded to them. The castings of GS 52 bolted to them transmit the intersection point loads of the bracing to the main girders.

3 | Section and plan of bridge, scale 1:50, showing the various layers.

-ANSCHLUSS OIAGONAIVER-BANO S. PLffi CIV Ke 4829

4 | The bridge with surrounding countryside.