Info

MLTStET

MLTStET

14 | Detail of roof construction, reception building, scale i:io. From bottom to top: 75 x 150 mm rafters, 25 mm boarding, polyethylene sheeting, 50 x 120 mm members with 100 mm thermal insulation laid between, 25 x 50 mm battens, roof covering made from 25 mm lapped weath-erboarding.

15 | Section of lookout tower.

15 | Section of lookout tower.

/JUpezjui hrv

fELULkiiET \ -

16 | Elevation of lookout tower, scale i:200.

17 | Plans, scale 1:200. Bottom, the lowest level; top, the observation platform.

18 | Worm's-eye view of the construction.

The detail of the fixing for the upper section of the stairs is very interesting. There is no more room at the bottom for the inner, inclined auxiliary posts carrying the inner stair stringer. So, the inner auxiliary posts begin exactly 180° offset on the existing ties at this point and are fixed by means of secondary ties correspondingly higher up the structure. A solution which is as brilliant as it is simple. The lower ends are pointed, thus allowing rainwater to drip off. The upper ends of all posts are spear-shaped to prevent water collecting. For safety reasons, the top of the central pole is fitted with a lightning conductor.

18 | Worm's-eye view of the construction.

3 | Longitudinal section through exhibition hall and theatre, scale 1:500.

4 | Overall view of puppet theatre and surroundings. In the foreground the exhibition hall, behind it the theatre with its square auditorium and rectangular block housing the stage.
0 0

Post a comment